Login|Register|Forget password|Dashboard Back to Home|Contact|Shopcart
Unverified1st Year

Runh Power Corp., Ltd.  

Agriculture & Food,Chemicals,Electrical & Electronics,Industrial Equipment & Components,Instruments & Meters,Lights & Lighting,Manufacturing & Processing Machinery,Metallurgy, Mineral & Energy,Textile

Search
新闻中心
  • 暂无新闻
产品分类
  • 暂无分类
联系方式
  • 联系人:Runhpower
  • 电话:86-532-80661837
  • 传真:86-532-80661833
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > Products > Coal-Firing Boiler Island (boiler & auxiliary systems)
Coal-Firing Boiler Island (boiler & auxiliary systems)
单价 面议对比
询价 暂无
浏览 200
发货 Chinaliaoninganshan
过期 长期有效
更新 2020-09-05 17:32
 
详细信息
Product Name: Coal-Firing Boiler Island (boiler & auxiliary systems) Model NO.: Various Phase: Various Generating Methods: Various Voltage: Various Maintenance: Available Upon Request Operation: Available Upon Request Assembly: Available Upon Request Trademark: Runh Transport Package: Negociable Specification: 100 to 600 MW Origin: Shandong Province Product Description Runh Power si also a supplier of Boiler Island, which refers to an unit of boiler and all its axuliary systems distributed in different physical levels. Among all the boiler islands provided by Runh Power, Fluidized Circulating Bed boiler (as known as FCB boiler) is one of the most popular models. referring to a type of boiler in which polverized fuel is burnt while being blown to circulate as fluid. FCB boiler is now the most recognizable boiler type, especially in the area of power generation.FCB boiler has following features :1. High burning rate: FCB boiler unit, among all the boilers, has the highest buring efficiency (98% to 99%) due to the circulation of fuel propelled by air blown to the furnace.2. Wide range of choice on fuel: FCB boiler was designed to burning most of fuel that are hard to burn otherwise, such as MSW (Municipal Solid Waste), coal gangue,kerogen shale and animal dung. Wide application of FCB has made power generation available to people in less developed area.3. Highly developed technology: the application of FCB boiler is one of the most developed area of Chinese power generation generation sector. Technical difficulties such as expansion, overheating, erosion, wearing-out have been overcome over the year, which makes the operation safer than ever.4. Low maintenance cost & long service: Silicon nitridelining extends the service life to over 20 years and also makes regular maintenance less frequent, compared to other boilers.5. Easy mounting of heat recovery system: heat recovery system can be mounted to boiler for collecting energy from exhaust. Combined with Low-temperature steam turbine provided by Runh Power, the FCB boiler is able to generate additional power, for either service power consumption or transmitting to grid.Runh Power positions itself no only a supplier of power plant equipment but also a contractor of EPC service (engineering, purchase & construction) delivering power station project.With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from the state bank.-1) Power Purchase Agreement (For independent power producers only)-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)-3) Sovereign bonds (Ifsovereign bonds are acquired and the commissioner has 15 % of capital need for the project, Runh Power could start the project while engaging China Export & Credit Insurance Corporation)-4) Construction Permit (optional)-5) Fire permit(optional)-6) Environmental impact assessment(optional)-7) Land Lease(optional)-8) Power Generation Power(optional)-9) Other documents deemed helpful(optional)Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC projectunfolds in the following order, which also constitutes Runh Power'sscope of service.1.The Argumentation of Project a. Verification of documents submitted b. Audition of documents by the authority c. Signing the contract2. Engineering Design a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner. b. Design of overall layout and all the sub-systems within the parameter of power plant. c. Selection of personnel participating in the project d. Submission of technical solution to the commissioner for review and approval.3.Equipment Purchase& Transportation a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc ) b. All the construction material, tools, spare parts and other necessities of the project4. Civil Construction a. All the civil construction work within the parameter of power plant5. Operation & Maintenance a. Operation of power plant (technical counseling)(Optional) b.Regular maintenance and inspection(Optional) c.Technical Training Program for Power Plant Personnel(Optional) d.General Overhaul(Optional)6. Installation & Testing a.Installation & testing for all systems & equipment provided by Runh Power b.Installation, testing & trail run of all systems of a power plant (Optional) c.Installation, testing & trail run of entire power plant (Optional)7. Supply of Spare Parts a. Long-term supply of spare parts and other consumibles.(Optional)Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.For viewing complete scope of Runh Power's service, please copy and paste following link to your browser.Runh Power's service catalog : http://runhpower.en.made-in china.com/product/DXOEPrMAqpUn/China-The-Catalog-of-Runh-Power-s-Service-Power-Plant-EPC-Contractor.html