Login|Register|Forget password|Dashboard Back to Home|Contact|Shopcart
Unverified1st Year

Runh Power Corp., Ltd.  

Agriculture & Food,Chemicals,Electrical & Electronics,Industrial Equipment & Components,Instruments & Meters,Lights & Lighting,Manufacturing & Processing Machinery,Metallurgy, Mineral & Energy,Textile

Search
新闻中心
  • 暂无新闻
产品分类
  • 暂无分类
联系方式
  • 联系人:Runhpower
  • 电话:86-532-80661837
  • 传真:86-532-80661833
站内搜索
 
荣誉资质
  • 暂未上传
友情链接
  • 暂无链接
首页 > Products > Coal-Firing Power Station: Engineering Purchase & Construction.
Coal-Firing Power Station: Engineering Purchase & Construction.
单价 面议对比
询价 暂无
浏览 96
发货 Chinaliaoninganshan
过期 长期有效
更新 2020-09-05 17:32
 
详细信息
Product Name: Coal-Firing Power Station: Engineering, Purchase & Construction. Model NO.: Various Phase: Various Generating Methods: Various Voltage: Various Maintenance: Available Upon Request Operation: Available Upon Request Trademark: Runh Transport Package: Negociable Specification: 25 to 100 MW Origin: Shandong Province Product Description Runh Power is one of the few Chinese contractors of thermal power station EPC project, specializing in the contruction and financing of coal firing power plants operating on various types of fuel, including:1. Anthracitic coal (highly coalirified, has low impurity content.)2. Bituminous coal (mildly coalirified, has low impurites and moisture)3.Gas coal (low coalirified, has high content of volatiles,source of gas )4. Lignate (poorly coalirified)5. Other types of coal used for generating power.Upon receiving analysis of coal content, engineers of Runh Power will be able to select the right model of boiler between circulating fluidized bed boiler and forced vibration grate boiler for the optimal performance of burning.For commissioning Runh Power a project of power plant, following documents are required for the approval of foreign investment. With at least PPA and Feasibility Report in place, Runh Power is able to help the commissioner to secure private investment or loan from the state bank.-1) Power Purchase Agreement (For independent power producers only)-2) Feasibility report (In case that there is none, designers and engineers can be dispatched to compile one at the expense of commissioner.)-3) Sovereign bonds (Ifsovereign bonds are acquired and the commissioner has 15 % of capital need for the project, Runh Power could start the project while engaging China Export & Credit Insurance Corporation)-4) Construction Permit (optional)-5) Fire permit(optional)-6) Environmental impact assessment(optional)-7) Land Lease(optional)-8) Power Generation Power(optional)-9) Other documents deemed helpful(optional)Runh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC projectunfolds in the following order, which also constitutes Runh Power'sscope of service.1.The Argumentation of Project a. Verification of documents submitted b. Audition of documents by the authority c. Signing the contract2. Engineering Design a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner. b. Design of overall layout and all the sub-systems within the parameter of power plant. c. Selection of personnel participating in the project d. Submission of technical solution to the commissioner for review and approval.3.Equipment Purchase& Transportation a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc ) b. All the construction material, tools, spare parts and other necessities of the project4. Civil Construction a. All the civil construction work within the parameter of power plant5. Operation & Maintenance a. Operation of power plant (technical counseling)(Optional) b.Regular maintenance and inspection(Optional) c.Technical Training Program for Power Plant Personnel(Optional) d.General Overhaul(Optional)6. Installation & Testing a.Installation & testing for all systems & equipment provided by Runh Power b.Installation, testing & trail run of all systems of a power plant (Optional) c.Installation, testing & trail run of entire power plant (Optional)7. Supply of Spare Parts a. Long-term supply of spare parts and other consumibles.(Optional)Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.Copy and paste superlinks below to your browser to view more products&services of Runh Power:Integraed Turbine Island: http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.htmlCondensing Steam Turbine:http://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.htmlCondensing & Extracting Steam Turbine:http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.htmlBack Pressure Steam Turbine:http://runhpower.en.made-in-china.com/product/lMJmfuSdJOGn/China-Back-Pressure-Steam-Turbine-of-Runh-Power.htmlSpare parts of Steam turbine and power plant & maintenance service: http://runhpower.en.made-in-china.com/product/RKOmcohdCrpt/China-Quick-Wear-Parts-Washer-etc-for-Steam-Turbine-and-Power-Plant.html