站内搜索
|
详细信息 Product Name: Heat Recovery System for Cement, Steel Mill&Boiler Model NO.: Various Phase: Various Generating Methods: Various Voltage: Various Maintenance: Available Upon Request Operation: Available Upon Request Trademark: Runh Transport Package: Negociable Specification: 25 to 100 MW Origin: Shandong Province Product Description Waste heat generated in the process of manufacturing cement or steel can be collected to generate steam and electricity.The heat recovery system developed by Runh Power, with its heat recovering steam turbine as the core component, has successfully helped dozens of manufacturers of cement, steel and pharmaceuticals maximizing their gains.Runh Power is dedicated to provide EPC service of heat recovery systemto global commissioners, scope of work including:- Engineering- Equipment purchase-Installation-Commissioning- MaintenanceRunh Power is dedicated to provide package service covering from end to end of a construction project of power plant.Services included in an EPC projectunfolds in the following order, which also constitutes Runh Power'sscope of service.1.The Argumentation of Project a. Verification of documents submitted b. Audition of documents by the authority c. Signing the contract2. Engineering Design a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner. b. Design of overall layout and all the sub-systems within the parameter of power plant. c. Selection of personnel participating in the project d. Submission of technical solution to the commissioner for review and approval.3.Equipment Purchase& Transportation a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc ) b. All the construction material, tools, spare parts and other necessities of the project4. Civil Construction a. All the civil construction work within the parameter of power plant5. Operation & Maintenance a. Operation of power plant (technical counseling)(Optional) b.Regular maintenance and inspection(Optional) c.Technical Training Program for Power Plant Personnel(Optional) d.General Overhaul(Optional)6. Installation & Testing a.Installation & testing for all systems & equipment provided by Runh Power b.Installation, testing & trail run of all systems of a power plant (Optional) c.Installation, testing & trail run of entire power plant (Optional)7. Supply of Spare Parts a. Long-term supply of spare parts and other consumibles.(Optional)Notice: EPS service, which refers to Engineering, Purchase & Supervision of Construction,is also available at your request, in case you prefer local construction contractor to international contractor.Copy and paste superlinks below to your browser to view more products&services of Runh Power:Integraed Turbine Island: http://runhpower.en.made-in-china.com/product/hbJmEuBKJdfU/China-Integrated-Turbine-Island.htmlCondensing Steam Turbine:http://runhpower.en.made-in-china.com/product/tbEmABSCZwaZ/China-Condensing-Steam-Turbine-of-Runh-Power.htmlCondensing & Extracting Steam Turbine:http://runhpower.en.made-in-china.com/product/GqxJRuXYTZAE/China-Condensing-Extracting-Steam-Turbine-of-Runh-Power.htmlBack Pressure Steam Turbine:http://runhpower.en.made-in-china.com/product/lMJmfuSdJOGn/China-Back-Pressure-Steam-Turbine-of-Runh-Power.htmlSpare parts of Steam turbine and power plant & maintenance service: http://runhpower.en.made-in-china.com/product/RKOmcohdCrpt/China-Quick-Wear-Parts-Washer-etc-for-Steam-Turbine-and-Power-Plant.html
|